欧美亚洲一区二区三区,2021国产三级精品三级在专区,久久久精品一区,美女福利视频一区二区,精品综合一区二区三区,一区二区三区久久精品,久久一区二区精品综合

EN
搜索

新聞中心

新聞中心

Zhejiang Haishun New Materials Co., Ltd. (Phase I and Phase Ii of Composite Materials and Combined Container Project)

發(fā)布時(shí)間:2024-05-01  瀏覽次數(shù): 911

phase I and phase II consist of 7 single steel structure production workshops, with a single building of 4 to 5 floors, with a total construction area of about 250,000 square meters. Among them, the height of the cornice of the fully automatic intelligent steel structure three-dimensional warehouse is 28 meters. The overall building facade is novel, with a large number of arcs as the shape, with  brightly colored ribbons.